If the resistance is within the standard, go to the next step, and check the shift solenoid valve operation.
5.
Shift Solenoid Valve - Operation Check
Connect a jumper wire from the positive battery terminal to shift solenoid valve A or B connector terminal No. 1, and connect another jumper wire from the negative battery terminal to connector terminal No. 2.
If a clicking sound is heard, repair the wire between the defective shift solenoid valve and the PCM, then go to the next step, and install the secondary valve body.