Paint Repair - Topcoat Drying
1. Topcoat Drying



1.
Allow sufficient set-up time:
After painting, leave the surface as is for about 10 to 20 minutes, in order to let the solvent evaporate and prevent defects during forced drying.

NOTE: Check the paint manufacturer‘s instructions because set-up time changes according to ambient temperature and paint layer thickness.

2.
Force Drying Topcoat:

Force dry the surface for approximately 30 to 40 minutes at a temperature of 140 °F (60 °C).
Always refer to the paint manufactures' instructions for the appropriate drying time.