Alternator Removal and Installation
1
Torque: N·m (kgf·m, lbf·ft)
1.
12 Volt Battery Terminal - Disconnect
2.
Drive Belt - Remove
3.
Drive Belt Auto-Tensioner - Remove
4.
Connector and Positive Alternator Cable - Disconnect
5.
Alternator - Remove
6.
All Removed Parts - Install
1.
Install the parts in the reverse order of removal.